PHANS4 CONSULTING

solid waste management consulting

    • Conduct assessment/study & preparation of Pre-feasibility report for setting up of power generating station using Municipal Solid Waste.
    • Preparation of pre-feasibility study on power generation using MSW in/around the city and suggest suitable technologies.
    • Preparation of detailed project design for a processing facility for conversion of Municipal Solid Waste to energy.
    • Construction of project related other infrastructure on site such as water lines, drainage line, stormwater drains, watchman quarter, etc.
    • PFR should include technical and financial parameters required for determination of tariff for such projects.
    • Assessment of environmental and social viability.
    • Site visit and data collection.
    • Quantitative and qualitative assessment of MSW.
    • Evaluation of the existing performance of the facility.
    • Identification of gap in existing solid waste management system.
    • Preparation of PFR.

Quick Links

About

Configure footer widgets from the WordPress dashboard.

Connect

Contact Us

© 2026 PHANS4 CONSULTING

Powered by Hamsa Theme