Projects

LIST OF COMPLETED PROJECTS

Khalwa Micro Lift Irrigation Scheme

Cost - 719 Crores | 42 Months Construction Period

Execution of Khalwa Micro Lift Irrigation Scheme on “Turnkey” basis comprising of lifting of 11.22 cumecs water for irrigation in 35,000 hectares from Submergence of ISP reservoir for providing water with Micro-irrigation up to 2.5-hectare chak with residual head of 23 meters at 2.5-hectare chak

Badnawar Micro Lift Irrigation Scheme

Cost - 1604 Crores | 48 Months Construction Period

Construction of Piped Irrigation system to supply water through pressurized pipeline system for micro irrigation (Drip/Sprinkler) to deliver at farmers’ fields up-to 2.50 Ha chak with a duty of 0.3204 Lit/Sec/Ha with at least 23 Meter Residual Head at each 2.50 Ha chak with total power requirement of 99.49 MW in Culturable command area of 50000 Ha, out of gross command area 74875 Ha.

Kalisindh Micro Lift Irrigation Scheme

Cost - 4284 Crores | 48 Months Construction Period

Construction of Piped Irrigation system to supply water through pressurized pipeline system for micro irrigation (Drip/Sprinkler) to deliver at farmers’ fields up-to 2.50 Ha chak with a duty of 0.3204 Lit/Sec/Ha with at least 23 Meter Residual Head at each 2.50 Ha chak with total power requirement of 140.169 MW in Culturable command area of 100000 Ha, out of gross command area 186163 Ha.

Pre Bid Review of RWSS - Bhogari Block (Odisha)

Cost - 237 Crores | 24 Months Construction Period

“Execution of 03Nos Individual Rural Piped Water Supply Projects pertaining to Bhogorai block (Phase-II) of Balasore District & GB Nagar & Saraskana Block of Mayurbhanj District including five years Operation & Maintenance” in EPC Mode”.

Pre Bid Review of RWSS - Kasinagar & Gumma Block (Odisha)

Cost - 153 Crores | 24 Months Construction Period

“Execution of Rural Piped Water Supply Projects pertaining to Kasinagar & Gumma block of Gajapati District including five years “Operation & Maintenance” in EPC Mode”.

Pre Bid Review of RWSS - Mahanga Block (Odisha)

Cost - 207 Crores | 24Months Construction Period

“Execution of Rural Piped Water Supply Projects pertaining to Mahanga block of Cuttack District including five years Operation & Maintenance” under one Package in EPC Mode”.

Technical Document - Morand and Ganjal Dam (M.P)

Cost - 1808 Crores | 24 Months Construction Period

“Construction of composite dams (i) Morand Dam on river Morand at Village-Morghat, Tehsil– Seoni Malwa of District-Hoshangabad for Gross storage capacity 249.85 MCM, Live storage capacity 226.124 MCM with Spillway and (ii) Ganjal Dam on river Ganjal at Village- Jawardha, Tehsil-Rahatgaon of District-Harda for Gross storage capacity 96.25 MCM, Live storage capacity 86.803 MCM with Spillway, Tunnel and all necessary components”.

Technical Document - Kasinagar & Gumma Block (Odisha)

Cost - 153 Crores | 24 Months Construction Period

“Execution of Rural Piped Water Supply Projects pertaining to Kasinagar & Gumma block of Gajapati District including five years “Operation & Maintenance” in EPC Mode”.

Technical Document - Mahanga Block (Odisha)

Cost - 207 Crores | 24Months Construction Period

“Execution of Rural Piped Water Supply Projects pertaining to Mahanga block of Cuttack District including five years Operation & Maintenance” under one Package in EPC Mode”.

Micro Irrigation Consulting - Drip Irrigation system

Location - India | Drip irrigation consulting services

Phans4 consultancy is india’s best drip irrigation consulting firm with services offered from site visit, design, pipe material, project management, operation & maintenance of the entire system.

Pre Bid Review of Drip Irrigation - Mulberry Gardens

Cost - 9 Lakhs| 100 Days Construction Period

Supply, installation, testing and commissioning of Drip/Micro Irrigation system in the farmers’ field under IVLP Programme.

Pre Bid Review of Drip Irrigation System - Faridabad

Cost - 13.93 Lakhs | 60Months Construction Period

Providing & Commissioning of drip/micro irrigation system for 50 mtr. wide green belt plantation along periphery (5.2km.) of HPGCL land in village Mothuka and Arua Ballabhgarh, Faridabad.

PHANS4 CONSULTING PRIVATE LIMITED has been supporting companies and startups around the globe, helping them to improve the sustainability of their competitiveness and performance capabilities along the entire value chain with the aid of innovative technologies and expert consulting.